A Connected Active Travel Network for North East Essex

The Sunshine Coast Greenway is a comprehensive walking, wheeling and cycling network linking Manningtree, Colchester, Brightlingsea, Clacton, Frinton, Harwich, and Walton

It is designed to connect existing isolated active travel infrastructure to make communities more connected, support everyday travel, and unlock the economic and health potential of North East Essex.

This is not just a tourism route, or a leisure route. It is strategic infrastructure that helps local residents and visitors alike.

What Is the Greenway?

The Greenway is a connected active travel route around Tendring and North East Essex, designed to:

  • Promote walking, cycling and wheeling
  • Enhance local transport options
  • Improve health and wellbeing
  • Boost the local economy
  • Reduce car dependency and congestion

The aim is to launch a route that is “good enough” quickly, then improve it over time.

This is about delivery, not perfection.

sunshine coast greenway map

A Pragmatic, Deliverable Approach

We are realistic.

The aspiration is:

  • A single coherent walking and cycling route
  • Fully wheelchair accessible
  • High quality greenways
  • Safe crossings
  • Strong continuity

But we also recognise that:

  • Some sections will initially use minor roads
  • Some improvements are needed
  • Missing links must be resolved
  • It can be phased

The principle is simple:

Launch as soon as it is good enough. Improve continuously.

What Makes a Route Attractive?

The Greenway focuses on what people actually want to use:

  • River and sea views
  • Traffic free or low traffic sections
  • Gentle gradients
  • Clear signing
  • Safe road, rail and river crossings
  • Good continuity between sections

These attractors are what make a route usable for:

  • Families
  • Older residents
  • Wheelchair users
  • Everyday commuters
  • Leisure users
  • Visitors

What Needs Fixing?

The route quality assessment we have done has identified real and practical issues:

  • Steps, stiles and barriers
  • Muddy, narrow or overgrown paths
  • Busy roads without cycle facilities
  • Lack of safe crossings
  • Missing links
  • Poor signing

This is exactly why the Sunshine Coast Greenway matters.

It identifies problems and provides a framework to fix them systematically.

View the presentation here to see how the Sunshine Coast Greenway can transform our region.

The Economic Case

The economic case is substantial.

Based on our modelling:

Tourism Revenue

Estimated annual economic impact:
£6.57m to £19.71m

Local Economic Impact

Savings and spending from increased active travel:
£9m to £25m annually

Active travel infrastructure is not just transport policy.
It is economic development policy.

Coastal cycling and walking networks elsewhere in the UK have demonstrated sustained visitor growth, extended stays and higher local spend.

North East Essex can do the same.

The Health Case

Regular physical activity:

  • Reduces the risk of chronic illness
  • Improves mental health
  • Reduces pressure on the NHS
  • Supports independent living in older age

The Greenway makes physical activity part of everyday life rather than something people have to schedule.

It lowers the barrier to participation.

The Environmental Case

  • Fewer short car trips
  • Reduced congestion
  • Lower emissions
  • Cleaner air
  • Safer streets

Active travel networks are a core part of meeting local and national carbon reduction commitments.

The Community Case

Beyond economics and health, the Greenway supports:

  • Civic pride
  • Safer routes to school
  • Stronger community links
  • Educational opportunities
  • Family activity
  • Intergenerational use

It becomes shared infrastructure that people value and protect.

Already Recognised in Policy

The route has been recognised in the draft Tendring Local Plan, demonstrating that the concept is already being taken seriously at district level.

The next step is ensuring Essex County Council treats it as strategic active travel infrastructure. We’ve started the ball rolling with £10k of seed funding from the council, but we need more support to make this a reality.

That requires political backing.


This Is Strategic Infrastructure

The Sunshine Coast Greenway is:

  • A transport project
  • A health project
  • An economic project
  • An environmental project
  • A community project

It aligns with:

  • Active Travel policy
  • Local Cycling and Walking Infrastructure Plans
  • Public health objectives
  • Economic regeneration goals
  • Climate commitments

It is long term infrastructure for North East Essex, an area which hasn’t had much investment in recent years.

What We Are Asking For

We are asking County Council candidates and elected members to:

  • Support the development of the Sunshine Coast Greenway in principle
  • Recognise it as strategic infrastructure
  • Work to secure funding for key missing links
  • Support phased delivery

The Greenway is deliverable.

What it needs now is political will.